More, nazis, euthanasia, Hans Frank.

NEW: Margarethe Hübsch (* 19. Juni 1903; † 30. August 1983) war eine Oberärztin und stellvertretende Primaria in der Wiener städtischen Nervenklinik für Kinder Am Spiegelgrund und Beteiligte an der Kinder-Euthanasie. Chief Dr. Acquitted.

http://en.wikipedia.org/wiki/Action_T4

At Posen (occupied Poznań), hundreds of patients were killed by means of carbon monoxide gas in an improvised gas chamber developed by Dr Albert Widmann, chief chemist of the German Criminal Police (Kripo). In December 1939, the SS head, Heinrich Himmler, witnessed one of these gassings, ensuring that this invention would later be put to much wider uses.[49]

Dr Helmut Unger, a consultant for the child euthanasia. No bio.

Marianne Turk (* 31 May 1914 in Vienna; † 11 January 2003 was) was an Austrian pediatrician and involved in crime in the context of Child euthanasia . Early release 1952.

Kurt Krause (Nationalsozialist), († 1944 ?), leader, Ghetto Riga. It’s unkn. if he was killed.

Benno Franz Theodor Martin (born February 12, 1893 in Kaiserslautern; died July 2, 1975 in Munich) was a German jurist and Nazi Germany Chief Constable in Nürnberg-Fürth, SS-Obergruppenführer General der Waffen-SS und Polizei as well as higher SS and police leader main.Dr Benno Martin was in charge of the depo. of the Jews from Nuremberg.
a part of the Russian prisoners had died. The second procedure concerned the involvement of Martin’s on four of seven transports of Jews from Swiss francs after Riga, Lublin and Theresienstadt between November 1941 and September 1942. At the beginning of the 1960s lived Martin in Munich

http://www.holocaustresearchproject.org/holoprelude/removal.htm

Hans Frank, Gov. of Poland:

The others had no pity for us either. As an old National Socialist, I must also  say that if the pack of Jews were to survive the war in Europe while we sacrifice the best of our blood for the preservation of Europe, then this war would still only be a partial success.

Hans Frank in Krakow

I will therefore, on principle, approach Jewish affairs in the expectation that the Jews will disappear. They must go. I have started negotiations for the purpose of having them pushed off to the East.

In January there will be a major conference on this question in Berlin to which I shall send State Secretary Dr Buhler. The conference is to be held in the office of SS Obergruppenfuhrer Heydrich at the Reich Security Main Office.

A major Jewish migration will certainly begin. But what should be done with the Jews? Can you believe that they will be accommodated in settlements in the Ostland?

In Berlin we were told: why are you making all this trouble? We don’t want them either – not in Ostland or in the Reichskommisariat: liquidate them yourselves!

Gentlemen I must ask you to steel yourselves against all considerations of compassion. We must destroy the Jews wherever we find them and wherever it is at possible, in order to maintain the whole structure of the Reich, the views that were acceptable up to now cannot be applied to such gigantic, unique events.

In any case, we must find a way that will lead us to our goal and I have my own ideas on this.

The Jews are exceptionally harmful feeders for us. In the Government – General we have approximately 2.5 million, and now perhaps 3.5 million together with persons who have Jewish kin and so on.

October 26, 1939,  order by Hans Frank mandating compulsory labor for the Jewish population

We cannot shoot these 3.5 million Jews, we cannot poison them, but we will take measures that will somehow lead to successful destruction; and this in connection with large-scale procedures which are to be discussed in the Reich, the Government-General must become as free of Jews as the Reich.

When and how this is to be done is the affair of bodies which we will have to appoint and create, and on whose work I will report to you when the time comes.

-This statement was made some five weeks before the meeting of senior officials at 56-58 Grosser Wannsee, Berlin, on January 20, 1942, where the final administrative details concerning the Final Solution of the Jewish question were discussed in detail.

————————————————————-

Bruno Peter Kleist (* 29. Januar 1904 in Marienwerder, Westpreußen; † nach 6. November 1971 suicide. nazi .

General Kurt Malzer, Nazi in Rome, died in 1952.

Austrian Ludwig Koch was the head of the Gestapo and the neo-Fascist Italian police in Rome and received 3 years imprisonment after the war.

Reiner Stahel, d. 1955  combat Commander of Rome was from September 1943 until December 1943.[1] Pope Pius XII. 1943 tried prior to the deportation of Roman Jews about the City headquarters to stop the upcoming RAID. He sent his liaison to the German authorities, so also to Sanders. It rejected the notion of himself with the remark that he had to create anything; the action is the sole judge of the SS.[2]In late July 1944 Stahel was appointed for a month the Red Army General of Warsaw in Poland, and was surrounded by the Polish home army during the Warsaw Uprising in his headquarters. The uprising was eventually put down and almost completely destroyed the city.[5][6]In late August 1944 the Oberkommando der Wehrmacht Stahel sent to Bucharest after the Royal coup d ‘ état and break of Romania as a combat Commander.[7][8] There he got together with Lieutenant-General Alfred Gerstenberg after a few days in Soviet captivity until his death in various camps, he spent. He died on November 30, 1955 in the prisoner of war camp Woikowo of a heart attack.

Theodor Emil Saevecke (born March 22, 1911 in Hamburg; died 2000) was an SS Hauptsturmführer (Captain) and war criminal, who was involved in the Organization of Tunisian Jews forced and executions of hostages in Italy in world of War II. After 1945, Saevecke worked for the American intelligence agency CIA and leading role in the German Federal Criminal Police Office.

Friedrich de Brix, Landrat (District Mayor) (Landratsamt) of Tilsit. Bialystok, nazi. No more info.

————————-

“Der Untermensch,” pamphlet. SS-Obersturmführer Ludwig Pröscholdt,  Jupp Daehler, and –König, , SS-Hauptamt-Schulungsamt were its producers.

Victor Rashid(* 27 November 1895 in upper Lazisk; died April 5 , 1966 in Heitersheim) was a Polish-German psychiatristwho was involved as a Director the Gau sanatorium Tiegenhof and T4 expert deep in NAZI euthanasia crimes.

Wilhelm Wesse (* 22 January 1912 in Düsseldorf; † October 20 , 1989 in Bad Hersfeld) was a German psychiatrist who took part in the euthanasia crimes of the Nazis in the 1930s and 1940s. During this time, he worked on several psychiatric hospitals, including the institution of Andernach, institution Waldniel , and the Kalmenhof in Idstein. In contrast to the most other perpetrators of Nazi euthanasia crimes that remained if they do not immediately were sentenced to death and also largely unscathed, Walsh had to serve a sentence of almost twenty years after the war.

Rudolf_Lonauer ..

Georg Renno (* January 13 1907 in Strasbourg; died October 4 1997 in Neustadt an der Weinstraße) was responsible for the killing of 28,000 people in the Nazi euthanasia programme T4 in 1940 as a Deputy Medical Director NS-Tötungsanstalt Hartheim.

Those chiefly responsible for recruiting the lower-ranking staff, according to subsequent witness statements, were the two Gau inspectors, Stefan Schachermayr (1912–2008) and Franz Peterseil (1907–1991), as well as Adolf Gustav Kaufmann (1902–1974), head of the inspection department of the T4 central office in Berlin. more names of Nazis involved in the Euthanasia:

Hermann Karl

Walter Kreuz

Stefan Schachermayr

Adolf Gustav Kaufmann

Franz Peterseil

———–

Fritz Ritterbusch (born. January 11 1894–. ?) -Nazi, a member of the crew of the camp Late, Hinzert concentration camp, Lublin and Gross-Rosen and SS-Obersturmführer[1] .[trans from polish, wikipedia]
He was born in Zschopau , near Werdau, government official. He participated in World War I, serving in 153. and 264. Infantry Regiment. He was a member of the SA, the NAZI PARTY from 25 January 1925 year (6 card number 317) and SS from the 1931 year (registration No. 9 107). In October 1934, the year the officer 91. Universal Regiment SS in Lodz. Since the spring of the year 1940 to January 30, 1941, the year he held an unspecified function in camp IV at KL Late, then was moved to the post of Commander of one of the wartowniczych company of the camp. The camp moved January 10, 1943 to the staff of the komendantury KL, where he was aide-de-camp to the Hinzert concentration camp ,Commandant of the camp, Paul Sporrenberg. 18 June in 1943 he moved to KL Lublin. In the spring of 1944 he seconded to KL Gross-Rosen, where from May this year to 13 February 1945 he was the Commander of the company, as well as the Manager of subcamps of Parschnitz in Pozici and AL of Trautenau in Trutnovie in the Czech Republic[2] .post-war fate not known.

Karl Fielitz, head of the Gestapo branch office in Antwerp, no info.

  • On 8 July 1981 judgment was given against Kurt Asche: Seven years’ imprisonment for aiding and abetting the murder of at least 10,000 Jews. Kurt Asche was his sentence in January 1983 in the prison Hamburg Fuhlsbüttel after its enforcement ability was detected.

    After serving his prison sentence Kurt Asche lived in Hamburg-Eimsbüttel. Died in 1998, meaning free from 1990 to 98.

NEW: Central Building office of the Waffen SS, East

http://forum.axishistory.com/viewtopic.php?t=3154&postdays=0&postorder=asc&highlight=gerhard+lachmann&start=15

Z.A.Heimann, named.

the Bauinspektions-Bereiche * Reich Nord (Berlin): SS-Stubaf. Schulring *

Reich-Süd (Dachau): SS-Ostuf. Herbert Karl or Hubert Karl

http://de.wikipedia.org/wiki/Hubert_Karl, b. 1907 From May 1943 until the collapse of the Nazi regime, he was eventually head of the Construction Inspection of the Waffen SS Empire-South   When the war ended, Karl arrested by the Allies and said subsequently in the process of Economic and Administrative Main Office of the SS as a prosecution witness. [2]

* Reich-West (Wiesbaden): SS-Stubaf. Robert Riedl

* Reich-Ost (Posen): SS-Stubaf: Wilhelm Lenzer or Lemzer?

* Böhmen und Mähren (Prag): ??? * Schlesien (Auschwitz/Kattowitz): SS-Stubaf. Karl Bischoff

* Südost (Schabac): ??? * Russland-Mitte (Minsk): ???

The Bauinspektionen were subordinated to Amt C-V/WVHA (Zentrale Bauinspektion; SS-Stubaf. Wilhelm Lemzer [sic]) and were subdivided into Zentralbauleitungen and Bauleitungen.

book: Peter-Ferdinand Koch (1988): Himmlers graue Eminanz – Oswald Pohl and the Wirtschafts-Verwaltungshauptamt der SS

(Camp Administration) lead by SS Obersturmbannführer Karl Mockel :Auschwitz d. 1948

Heinrich Schoppe, SS-Unterscharführer b. 17.5.1922. Fate Unknown.

SS-Uscha. Gottfried Weisse

Walter Urbanczyk served at Auschwitz concentration camp as deputy to construction office. He was SS-Obersturmfuhrer (F) and was born on 12 June 1901 in Hungary . Disappears after 1945. http://forum.axishistory.com/viewtopic.php?f=5&t=47430

http://forums.gunboards.com/showthread.php?115427-KL-Auschwitz-crematorium-blueprints

In May 1945 he was arrested by the allies but they only kept him in a detention camp from he was released after a few months.  His post war life is a mystery.  He was never prosecuted.  Actually all officers from the “Zentral Bauleitung der Waffen SS und Polizei Auschwitz O/S”, the unit that was responsible for the construction of the crematoriums and gaschambers in Auschwitz, their “job” made it possible to exterminate 700.000 people, got away with their crimes unpunished.  Karl Bischoff, the leader of this unit, died in 1950 and has never been tried.  Walter Dejaco & Fritz Ertl , the architects of the crematoriums & gaschamber were prosecuted in Vienna in 1972 for their part in the holocaust but were acquitted of all charges in 1972; their defence: we were only following orders.

This is a document from the ss construction office in KL Auschwitz.  The document is written on March 5 1942 to the ss administration office that was responsible for the construction of the concentration camps: SS Wirtschafts-Verwaltungshauptamt Ambtsgruppe C/I.  In this letter Karl Bischoff is asking what the policy is on the use of Zyklon B (Blausäure vergassung) for delousing KL inmates, because he has heard from ***Z.A.Heimann from the SS Bauinspektion Ost der Waffen SS, that it is prohibited to use Zyklon B for this purpose. And if this is the case he has to adapt the laundry building.  The letter is signed by Bischoff and on the bottom someone in Berlin has written that they are going to wait with an conclusive answer until they have done sufficient testing.   Although it is a letter about the use of Zyklon B for what it initially was designed for, desinfecting clothing, it were these engineers and their design work that made the gaschambers in Auschwitz so efficient. source:  http://www.warrelics.eu/forum/photos-papers-propaganda-3-reich/kl-auschwitz-crematorium-blueprints-4708-2/

de, wiki : Dejaco, Walter: Subject-matter of their involvement in the Holocaust was by design, construction and maintenance of the gas chambers and crematoria of Auschwitz-Birkenau. Dejaco was also accused of 1940-1942 killed twelve concentration camp prisoners or killed. [11]

“Their construction was from the outset a short-vegetating the prisoners aligned, and placed a mockery of the basic principles of construction technology that represents the defendants were well aware that they no windows and adequate ventilation built, closely adjacent barracks did not offer enough living space for people, we see from their efforts to improve the watch dogs and cows certain barracks through adequate ventilation to ensure a healthy posture of the animals. “”

– From the indictment of 18 June 1971 against Walter Dejaco and Fritz Ertl before the Regional Court of Vienna [12]

The Central Construction Office of the Waffen-SS and Police Auschwitz under their temporary manager Karl Bischoff was the Waffen-SS associated construction management for the design, planning and construction of the extermination and concentration camp Auschwitz-Birkenau, along with the gas chambers and crematoria at the time of the German occupation of Poland between 1941 and 1944th Their involvement in it can be estimated by preserved up to the present document relatively well. This SS-house planning and construction management agency designed the corresponding plans and made locally for their implementation to ongoing repair work during the mass killings by other perpetrators, who belonged to the SS camp.

1 SS construction department of the main camp  2 Central Construction  3

SS construction department of the main camp [Edit]   On 27 April 1940 ordered Reichsführer-SS Heinrich Himmler, built in Oswiecim (Auschwitz) to a regional prison and transit camp for 10,000 men. [1] in the suburb Zasole were several brick buildings that had previously served as the Polish artillery barracks. For the expansion of the main camp, the SS New Construction Department Auschwitz / Upper Silesia was responsible, it was in May 1940 led to the November 1941 by architect

August Butcher [2] ????

Senior staff were among others Walter Urbanczyk as deputy, [3] the architect Walter. Dejaco and the civil engineer Fritz Ertl.   The camp commandant Rudolf Hoess was a weekly report on the progress of the construction work. Initially focused on water supply, drainage and drainage of the site. Among the first construction projects included the renovation of a former ammunition depots (“bunker”) at a crematorium;. Was a first furnace of Topf and Sons ready in August 1940 [4] In September 1940, ordered Oswald Pohl, the storage capacity by increasing make 14-story barracks. On the completed building plans included the renovation of the building later known as Block 11, in the basement were dark cells. [5]   Hans Kammler, the SS Main Office Budget and Construction ordered on 27 September 1941, [6] to build the “Area of ​​Interest Auschwitz” a new camp for first 50,000 Soviet prisoners of war – later to Auschwitz-Birkenau. Kammler believed, August butcher is not the pending tasks grown larger, [7] and gave early October 1941, Karl Bischoff this task.   Central Construction

Almost all known plans for the war prisoners and concentration camp Birkenau originate from 1941 from Bischoff himself partly complementary works were awarded to civilian architects, responsible Bischoff was always personal. The superior authority it was the official group C (Department of civil engineering) in the central SS Economic and Administrative Main Office in Berlin, the direct superior was SS-group leader Hans Kammler.   In early 1943, there are about 20 members of the SS in the Engineer, the roughly 100 detainees – let architects, surveyors and engineers work as a character agents and surveyors for the murder machine.   In April 1944, Bishop left the concentration camp for a new office to Katowice (Katowice dt). The Central Construction Office of the concentration camp Birkenau was closed and the building sealed in the course of 1944. With the destruction of the records of the concentration camp in January 1945 by the SS the disused building in the Central Building was “forgotten” or not included as an existing archive services. Therefore, this archive of the Central Construction as documentary material largely preserved in state archives in Moscow and can be explored. In breaking the records remained in the immediate post-war period, a smaller portion of its records in Poland. Bischoff’s successor on the ground was from 1 November 1943

Werner Jothann.   The Head of Office   Bischoff worked on construction of the railroad, was used in World War I in 1917 in the Air Force. After the war he completed a degree in civil engineer. Bischoff was a member of the Nazi Party from 1932, and a member of the SS From 1935 he worked as a civilian in the “Office of the Chief Administration for construction of the Air Force” after the war began, and worked mainly in the construction of airfields in Belgium and northern France participated. The SS General Hans Kammler leader Bischoff offered the rank of SS-Hauptsturmführer and the leading role of the special supervision (later Central Construction) for the planned construction of a prisoner of war camp at Auschwitz. In October 1941, Bishop first met with Kurt Prüfer of Topf & Sons and was on site plans for a large new crematorium morgue in construction. The plans are (get consenting initials of Kammler and Himmer) in part with the names. Although the internal service road on the object of the death camps was rarely addressed directly, Bischoff reported to his superior Kammler early completion of “Crematorium II” in a letter dated 29 January 1943 with the following words:

“The ovens in the presence of the Lord was the chief engineer examiner exporting firm, company fired pot and Sons, Erfurt, and funtionieren perfectly. The reinforced concrete ceiling of Mortuary was due to frost not be struck. Which is not significant, since the gasification cellar can be used for this purpose. [8] ”

„Die Öfen wurden im Beisein des Herrn Oberingenieur Prüfer der ausführenden Firma, Firma Topf u. Söhne, Erfurt, angefeuert und funtionieren tadellos. Die Eisenbetondecke des Leichenkellers konnte infolge Frosteinwirkung noch nicht ausgeschalt werden. Die ist jedoch unbedeutend, da der Vergasungskeller hierfür benützt werden kann.[8]“

↑ Holocausthistory: „Vergasungskeller“ (Brief von SS-Hauptsturmführer Karl Bischoff an SS-Oberführer Hans Kammler, 29. Januar 1943).

Also, this document comes from the archive of the Central Construction Office, which had been disbanded 1944th The documents thus escaped the destruction of documents by the retreating Nazis and were transferred to the Moscow State Archives. In the schedule, there are also orders for apparatus for the detection and special doors, their purpose is clear.   2008 in Germany discovered the original blueprints of the “supervision of the Waffen-SS and Police Auschwitz” in 2009 the Holocaust Memorial Yad Vashem have pledged to Israel. [9]

Jothann Werner (born 18 May 1907 [1] in Eldenburg (goods) / Waren (Müritz), † unknown) was a German civil engineer, and the October 1943 led the Central Construction Office of the Waffen-SS and Police Auschwitz.   Life []   Jothann graduated after completing his school career studying at the higher technical colleges Neustadt and Buxtehude. [2]   Activities during World War II   Jothann early 1941 was assigned to the supervision of the SS New Construction Department Auschwitz / Upper Silesia, the developing the company’s main camp. In December 1941 it was integrated into the Central Construction Office of the Waffen-SS and Police Auschwitz, led by Karl Bischoff.   In March 1942 Jothann was appointed SS-man assault. Jothann was mainly responsible for the construction of the factory igniter Krupp AG and the district heating plant. Despite the low level of service, he was appointed bishop of the “key worker to be carried out for the special action”. Jothann learned in March 1943, an extraordinary rise in rank and was immediately promoted to SS-Obersturmführer (technical leader of the Waffen SS – Section Building [2]) promoted.   In early April 1943 followed by Jothann Fritz Ertl as deputy of Bischoff. In early November 1943, he took over as Bischoff’s successor, the construction management at Auschwitz and was assigned to carry out the duties as head of the Central Construction Office. [3] He remained “closely connected to his former boss and subordinate.” [4]   Jothann commissioned the firm of Topf and Sons in order to overtake the ovens of the crematoria of Auschwitz-Birkenau, and was installed on the arrival of Hungarian Jews in May 1944, a vent in a gas chamber. [5]

— some of this info is repeated on another page in this blog=

END

One Response to “More, nazis, euthanasia, Hans Frank.”

  1. RGT Bad Neustadt | Discount Suche Says:

    […] More, nazis, euthanasia, Hans Frank. | Paolosilv’s Blog Feb 2, 2012 … Universal Regiment SS in Lodz. …. after completing his school career studying at the higher technical colleges Neustadt and Buxtehude. […]

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: